Bedroom 2:
201 sq/ft width 15' 6" x depth 13'
Bedroom 3:
156 sq/ft width 13' x depth 12'
Bonus Room - Unfinished:
315 sq/ft width 21' x depth 15'
Family Room:
351 sq/ft width 22' 8" x depth 15' 6"
Garage:
637 sq/ft width 25' x depth 25' 6"
Living Room:
360 sq/ft width 23' 6" x depth 15' 4"
Master Suite:
275 sq/ft width 14' x depth 19' 8"
Nook:
144 sq/ft width 8' 6" x depth 17'
Patio:
236 sq/ft width 23' 8" x depth 10'
PDF Print Set
: $1245.00 |
A non-modifiable, print only PDF file |
5 Copy and PDF Set
: $1375.00 |
5 printed plan sets mailed to you plus PDF plan sets are best for fast electronic delivery and inexpensive local printing. |
Eight Copy and PDF Set
: $1505.00 |
8 printed plan sets mailed to you plus PDF plan sets are best for fast electronic delivery and inexpensive local printing. |
PDF Master Set
: $2375.00 |
An unlocked, modifiable PDF file |
CAD Set
: $2595.00 |
For use by design professionals to make substantial changes to your house plan and inexpensive local printing. |
Master Builder Package
: $2855.00 |
Includes CAD Set, PDF Masters and Unlimited Build License |
Single Set
: $995.00 |
One printed set for bidding purposes only. Not a legal building set for construction. |
Crawlspace: $0.00 |
Ideal for semi-sloped or level lot, home can be built off of grade, typically 18” - 48”. |
Right-Reading Reverse
: $300.00 |
Choose this option to reverse your plans and to have the text and dimensions readable. |
Additional Construction Sets
: $65.00 |
Additional hard copies of the plan (can be ordered at the time of purchase and within 90 days of the purchase date). |
Additional Use License
: $995.00 |
Additional Use License. |
Audio Video Design
: $100.00 |
Receive an overlay sheet with suggested placement of audio and video components. |
Construction Guide
: $39.00 |
Educate yourself about basic building ideas with these four detailed diagrams that discuss electrical, plumbing, mechanical, and structural topics. |
Lighting Design
: $200.00 |
Receive an overlay sheet with suggested placement of lighting fixtures. |
*Alternate Foundations may take time to prepare.
*Options with a fee may take time to prepare. Please call to confirm.